For manufacturers

Fewer losses.
Improvements seen through.

I help manufacturers find the root cause of recurring problems, and I work with the in-house team to see the necessary improvements through.

I work on a defined production line, loss area or technical problem, from assessing the baseline to verifying the result.

MiskolcOn-site and remote work, within agreed termsAutomotive · pharmaceutical · aerospace

Sound familiar?

Where external improvement capacity can help

01

The same problem keeps coming back

The fault gets fixed, then it returns. Several actions have already been taken, but it is unclear which one would bring lasting improvement.

02

Plenty of data, but the next step is hard to define

There are plenty of reports and fault tickets, but it is hard to decide which loss to tackle first, and there is no time left to follow up on actions.

03

Improvement work takes a back seat to daily operations

The team knows the problem, but alongside daily work there is no one to run it as a project and keep track of the tasks.

04

The technical intervention involves several departments

Production, maintenance, engineering and quality tasks need to be coordinated, with external contractors where necessary.

How I help

Four areas I work in

1Productivity and loss reduction

Identifying downtime, cycle-time, scrap and rework losses on a defined line or area, then organizing the improvements. I apply OEE and TPM methods tailored to the task.

Outcome
Shared priorities, a trackable action plan, measured results.
Conditions
One clearly defined area; results are evaluated against a measurement agreed in advance.

2Structured problem solving

I help investigate recurring technical and quality problems and customer complaints: root cause analysis, leading the problem-solving team, and verifying the effectiveness of actions.

Outcome
Substantiated findings and verified actions.
Conditions
Based on an individual assessment; I do not promise customer acceptance or guaranteed closure.

3Technical development and industrialization

Preparation and technical coordination of upgrades, machine process improvements and defined parts of production line launches, aligning technical, quality and project milestones.

Outcome
A clearly specified technical scope, coordinated execution, acceptance points.
Conditions
Full turnkey implementation is not automatically part of the service.

4In-house team development

Practical workshops and coaching for engineers and internal project leaders, using your own plant topics.

Outcome
Problem solving and action tracking remain working practice after the project ends.
Conditions
Small groups, with an agreed curriculum.

How can we start?

There is no need to start with the whole plant

A well-defined production line or loss area can be a good starting point.

Consulting rates

  • Daily consulting: €1,400/day
  • Half-day consulting: €790/half-day
  • Hourly consulting: €190/hour

Loss diagnosis, project management and workshops: quoted individually.

  1. A short technical discussion

    We review the problem, the area concerned, the available data and the internal involvement required.

  2. Loss diagnosis, if needed

    A result that can also be used on its own: baseline, data quality findings, loss priorities and three to five recommended improvement topics.

  3. A precisely defined improvement project

    Based on the actual task, we define the objectives, scope, division of responsibilities, milestones and fee.

How I work

Four steps of the work

  1. 1

    We clarify what we want to change

    We record the problem, the KPIs, the baseline, and who the project owner is on the client side.

  2. 2

    We choose the intervention based on facts

    We build on data and shop-floor experience. We keep what has already been proven separate from what still needs to be verified.

  3. 3

    We organize and track implementation

    We assign owners and decision points, and track tasks regularly. Involving external specialists is agreed separately.

  4. 4

    We verify what has changed

    We evaluate against the jointly agreed measurement. Solutions that work get a standard, an owner and a sustainment plan.

I work as external capacity alongside the in-house team, not instead of it.

  • Client-side project owner: with decision-making authority and regular check-ins.
  • In-house delivery team: production, maintenance, engineering, quality, depending on the task.
  • My role: methodology, project management, technical support and team development.

Data analysis

Downtime analysis and a reusable tool

If downtime data is available, I help make it clear which equipment, events or loss categories should be addressed first.

I build and hand over a tool of my own development to process the agreed data export, so the in-house team can repeat the analysis with future data.

  • the structure of the export to be processed
  • the calculation and categorization rules
  • the data handling and confidentiality terms
  • the usage and support terms of the tool handed over

The analysis supports setting improvement priorities. What causes the loss and what needs to be done must be investigated separately.

Illustrative Pareto chart with synthetic data
Illustrative chart with synthetic data, not an actual result.

Digital tools in manufacturing

Digital tools I have developed or led

In my industrial roles, I built internal digital tools and, as a team leader, led their development. Each one supported a specific task in daily engineering and management work.

01 Own development

Financial dashboard

A dashboard for clear tracking of financial KPIs.

02 Own development

CMMS-linked Pareto analysis

A Pareto analysis tool built on data from the computerized maintenance management system (CMMS) for ranking failures and losses.

03 Development led

Power BI dashboards

Power BI dashboards for clear, visual tracking of data.

04 Development led

Digital TPM software

Software for digitally recording and tracking TPM activities.

05 Development led

Digital lot release record

A digital solution developed to replace the paper-based lot release record.

These tools were built for internal use in employer environments. For confidentiality reasons, I do not show screenshots or details of them.

Portrait of Attila Hajdu
Attila HajduFounder of YORUMA

Professional background

Shop-floor experience, engineering mindset, team development

I have worked in industrial environments for more than 13 years, in automotive, pharmaceutical and aerospace manufacturing. I have led maintenance and engineering teams, and previously also supported plant improvements as an external consultant.

My work has included OEE and TPM improvements, production line launch and ramp-up, technical upgrades, complaint investigations, and training engineers and technicians. I have also worked with industrial cameras, robots and production data processing.

−50% machine downtime Aerospace · Shingijutsu Kaizen · 15-person team · 10 critical machines · February–April vs. May–July

In an aerospace environment, I led a 15-person Shingijutsu Kaizen team. The improvement covered 10 critical machines of different technologies: machining and CNC machines, a waterjet cutting machine, vacuum furnaces, an automated paint line, abrasive blasting equipment and EDM machines.

The total downtime of the 10 machines recorded in the CMMS fell by half in the May–July period compared with 576 hours in February–April. A sustainability review based on the CMMS data also confirmed the result.

Following this work, Yukio Katahira invited me to an advanced training workshop in Japan.

Shingijutsu recognised my work on the project with a certificate.

−30% machine downtime Maintenance manager · own area of responsibility · Jan–Sep 2026 vs. Jan–Sep 2025

As maintenance manager, machine downtime in my area of responsibility fell by a total of 30% in January–September 2026 compared with the same period in 2025.

+30% productivity Automotive · engineering manager · own area of responsibility

As engineering manager in an automotive environment, productivity in my area of responsibility rose by 30% through cycle-time optimization, OEE improvement and scrap reduction.

Over the same period, the area’s annual result turned from a loss to a profit: the annual result improved by 200% of the initial loss amount.

In our work together, I address the technical solution and the organizational conditions for implementation together. An action is only worth something if someone afterward understands and sustains it. I pay particular attention to this at the end of the project.

  • 13+ yearsof industrial experience
  • 3 industriesautomotive, pharmaceutical and aerospace
  • 10–34 peopleengineering and maintenance teams led

Technology background: assembly and test lines, screwdriving and pressing, plastic and laser welding, machining, vacuum heat treatment, plasma and flame spraying, industrial robots and camera-based inspection.

When technical implementation is also needed

Involving an external contractor

The improvement may also require a machine builder, system integrator, automation specialist or other contractor. I can help specify the task, compile the technical requirements and coordinate bringing in the right partner.

The partner’s suitability, capacity and terms are checked separately for each project; implementation and warranty responsibilities are set out at the start of the cooperation.

Frequently asked questions

What to know before our first conversation

Do you only give recommendations, or do you also lead the improvement?

Both are possible. I take on stand-alone diagnoses as well as management of defined improvement projects. The scope of the task and responsibilities is set out in the proposal.

How large an area should we start with?

A defined line, machine group or loss area where there is a clear problem, accessible data and enough capacity for implementation.

Do you offer stand-alone problem-solving or complaint support?

Yes, based on an individual assessment of the task. We clarify the deadline, my role, and the client-side decision and approval points in advance.

How can you help with a new production line launch?

With defined sub-tasks: aligning technical, quality and project milestones, and supporting ramp-up. I do not take on full-time on-site launch management.

What in-house team is needed?

A project owner with decision-making authority and the specialists the task requires, who can take part in implementation. They typically come from production, maintenance, engineering and quality.

Do we also get the analysis tool?

Yes, if we agree on it. The tool handed over is defined for the agreed export format and functions; usage rights, support and later modifications are set out separately.

Do you work at weekends?

By prior arrangement, at a separate rate. This does not mean continuous on-call availability; access, internal participation and safe working conditions must be arranged in advance.

How is the fee determined?

Based on the scope of the task, the expected output, on-site and remote work, and the scope of responsibility. The diagnosis and the implementation can also be ordered separately.

Contact

Let’s start with a specific improvement topic

Which recurring problem or loss needs attention now? For the first discussion, a brief description of the process concerned and the goal is enough.

There is no need to send confidential technical documents, complaint records or plant data files when first getting in touch.

How the proposal is prepared

  1. I reply to your inquiry within two business days.
  2. A short online or phone call about the problem, the area concerned and the goal.
  3. Within 2 business days of the call, I send a written proposal: scope, itemized fee, items excluded from the service, validity.

Requesting a proposal is free of charge and creates no obligation to order. Details: Terms and Conditions.